Primarschule Erlenmatt
Basel, 2027. On site.
- Client
- Erlenmatt School Building Trust
- Programme
- Primary school for 12 classes, double gym, day care
- Gross floor area
- 5,120 m²
- Construction
- Timber and concrete composite floors on concrete cores
- Engineer
- Huber Lenz Ingenieure, Basel
- Dates
- Competition 2022, on site since March 2025, opening August 2027
- Team
- Ines Weyl, Jonas Kessler, Lea Bruhin, Tomás Ferraz
Three floors of four classrooms each, stacked and shifted so that each floor roofs part of the yard below and opens onto the roof of the one beneath. The shifts give every classroom two orientations and a terrace the width of the room.
The structure is the plan: four concrete cores carry timber composite slabs spanning 9.6 metres without beams, so the classroom walls can move when the school does.