Weather Rain easing by nine. Low 4°C. Wind westerly, fresh.

The Evening Dispatch

Late City Edition Vol. CXXXVIII, No. 331 Price £1.20

Port Averil’s evening paper, printed nightly at Coldharbour since 1888

Late City Edition

City votes to dig up its buried river

Council backs £38.6m plan to open the Linnet beneath Tannery Row by 31 votes to 22. Traders warn of two lost winters behind hoardings.

City By Odalys Brandt, City Hall Correspondent

A wide, empty city road at night, its wet tarmac streaked with red and white reflections from traffic lights.
Tannery Row an hour after Tuesday’s vote. The Linnet runs in a brick culvert about three metres under the nearside lane. Photograph: Ines Marchetti for the Dispatch

Port Averil will uncover the river it buried 115 years ago, after councillors voted on Tuesday night to open 1.4 kilometres of the Linnet beneath Tannery Row.

The £38.6 million scheme passed by 31 votes to 22 at the end of a four-hour debate. It will replace two traffic lanes and 212 parking bays with an open channel, planted banks and three footbridges between Cooper’s Yard and Quay Steps.

Supporters say the Edwardian culvert can no longer carry the water that storms now send into it. The river burst from its manholes in October 2024 and flooded 412 properties, and did so again in September 2025.

Traders on the Row fear two years of lost custom. The council has promised a £1.8 million hardship fund and work in four stages. Digging begins in March 2027.

Turn to The Long Read

Night trams return to the Quay line after eleven years

Transport By Caspian Lowe

A tram waiting at a stop at night, its red tail lights reflected along wet rails.
The 1.50 at Lantern Street during last month’s trial. Photograph: Ines Marchetti

The last tram from Quay Steps will leave at ten past two in the morning from Friday week, restoring a night service that was cut in 2015.

Averil Tramways said cars would run every twenty minutes between midnight and the final departure on Fridays and Saturdays, calling at all fourteen stops to Hob’s Field. A single fare stays at £2.10.

The operator has trialled late running on four weekends since August and carried 9,300 passengers, a third more than it forecast. Hospital porters, bar staff and bakers made up most of the early custom, according to conductors’ counts.

“The city does not shut at midnight and neither should the way home,” said Priya Castellan, the tramway’s general manager.

Residents of Lantern Street, where the line runs within four metres of bedroom windows, have asked for a 15 mph limit after one o’clock. The company says it will fit quieter wheel dampers to the six cars rostered for nights before the service begins.

The river under Tannery Row is coming back up

For 115 years the Linnet has run in a brick pipe beneath the city centre. After two floods in eleven months, Port Averil has voted to let it out.

Stand outside Dross & Daughter, the cobbler’s at number 41 Tannery Row, on a wet evening and you can hear it. Not the traffic, not the gulls off the quay, but a low steady rush coming up through the iron grating by the kerb. Halima Dross has heard it every working day for twenty-six years. “Customers ask if it’s the drains,” she says. “I tell them it’s the river. Most of them think I’m joking.”

She is not. The Linnet rises in the allotments at Hob’s Field, runs 6.2 kilometres through the east of Port Averil and meets the harbour at Quay Steps. For most of that distance nobody has seen it since 1911, when the corporation finished bricking it into a culvert and laid Tannery Row on top. On Tuesday night the city council voted, 31 to 22, to take the road off again.

The scheme approved this week will open 1.4 kilometres of the river to the sky, from Cooper’s Yard to the harbour mouth. Tannery Row will lose two of its four traffic lanes and all 212 of its parking bays. In their place the plans show a channel eleven metres wide, planted banks, three footbridges and a cycle path. Work is due to start in March 2027 and finish in the spring of 2029.

A pipe built for a smaller city

The argument for it was made, in the end, by water. In October 2024 a night of rain sent more into the culvert than it could carry, and the Linnet came up through the manholes instead. It flooded 412 properties in the streets around the Row. Eleven months later it did so again, less badly, on a Sunday afternoon.

You cannot argue with that sum. The water goes somewhere.

Tobias Renwick, drainage engineer

“The culvert is a very good piece of Edwardian engineering,” says Tobias Renwick, the city’s principal drainage engineer, who has walked its length in waders more often than he would like. “It was built to carry nine cubic metres of water a second. In the 2024 storm we estimate the river wanted to move twenty-three. You cannot argue with that sum. The water goes somewhere.”

Renwick’s department looked at three ways out. A second culvert alongside the first would have cost more than opening the river and closed the Row for longer. A storage tank under Mercer Park would have protected the streets downstream of it and none upstream. An open channel, with banks that are allowed to flood, holds four times what the pipe can and shows the city what the water is doing.

What the Row stands to lose

Not everyone on Tannery Row hears the rush under the grating as a promise. The street has 64 shopfronts, and the traders’ association says a third of its members doubt they can survive two years behind hoardings. Gregor Hale, who leads the opposition group on the council and voted against, calls the scheme “a park paid for by people who sell shoes”.

“Nobody in that chamber is against a river,” Hale told the Dispatch after the vote. “I am against telling a florist she will have no deliveries and no passing trade for two winters, and that she should be grateful because there will be reeds.”

The council’s answer is a hardship fund of £1.8 million and a promise to build in four stages, so that no stretch of the Row is closed for more than seven months. Marguerite Oyelaran, who chairs the environment committee and has pushed the scheme since the first flood, accepts that neither will satisfy everybody. “We are asking the Row to carry the cost of protecting the whole of the east side,” she says. “I would be angry too. I would also rather be angry than flooded.”

The bill is £38.6 million. A little over half comes from the national Flood Resilience Fund, with the rest split between city borrowing and the Linnet Trust, a charity that has campaigned for the river since 1998. Officers told councillors that the two floods cost the city and its insurers £52 million between them.

People with umbrellas passing lit shopfronts, seen through a window running with rain so that the lights smear into streaks of yellow and blue.
The Row in Tuesday’s rain, from the window of the Copper Kettle cafe at number 38. Sixty-four shopfronts face two years of work in four stages. Photograph: Ines Marchetti for the Dispatch

What is down there

What will come up when the road does is less certain than the drawings suggest. Dr Anselm Pruett, who keeps the city’s archive of maps, has spent the autumn laying nineteenth-century surveys over the engineers’ plans. The river the Victorians buried, he says, was not a pretty one. Tanneries gave the Row its name and the Linnet its colour, and a health inspector’s report of 1887 describes the water as “the shade of strong tea, and not so wholesome”.

I would rather be angry than flooded.

Marguerite Oyelaran, environment committee chair

“People picture a chalk stream with kingfishers,” Pruett says. “What we had was a working ditch. What we will get is something new, and it will take a decade to look as if it belongs.”

The water itself is cleaner than it has been for two centuries. The last tannery closed in 1962, and samples taken from the culvert this summer found brown trout fry at two of five sites. Renwick thinks eels will follow within a year of the channel opening, since they already gather at the outfall grille at Quay Steps as if waiting to be let in.

Back at number 41, Halima Dross has looked at the staging plan and worked out that the hoardings reach her door in the autumn of 2028. She voted, in the traders’ ballot, to oppose the scheme. She has also asked the council whether the grating outside her shop can stay where it is, set into the new pavement, when the work is done.

“I’m told there won’t be anything under it by then,” she says. “The river will be over there, in the open, where everybody can see it. I said I know. I’d like to keep it anyway. It’s where I learned it was real.”

Odalys Brandt has covered City Hall for the Dispatch since 2019. Write to her at the newsdesk, 1 Coldharbour Quay.

Notes

  1. Full Council, November 24, 2026, item 9. Of 60 members, 31 voted for and 22 against. Three abstained and four were absent.

  2. Port Averil Flood Inquiry, final report, March 2025. The 412 properties were 288 homes and 124 businesses.

  3. Capacity is taken from the corporation’s drawings of 1911. Peak flow comes from the inquiry’s hydraulic model, which gives a range of 21 to 25 cubic metres a second.

  4. The fund contributes £21.0 million, city borrowing £11.4 million and the trust £6.2 million, according to the finance officer’s report to council.

  5. Linnet Trust and Averil University freshwater survey, July 2026. Fry were found at Cooper’s Yard and at the Mercer Park inspection shaft.

1 Full Council, November 24, 2026, item 9. Of 60 members, 31 voted for and 22 against. Three abstained and four were absent.

See all notes

2 Port Averil Flood Inquiry, final report, March 2025. The 412 properties were 288 homes and 124 businesses.

See all notes

3 Capacity is taken from the corporation’s drawings of 1911. Peak flow comes from the inquiry’s hydraulic model, which gives a range of 21 to 25 cubic metres a second.

See all notes

4 The fund contributes £21.0 million, city borrowing £11.4 million and the trust £6.2 million, according to the finance officer’s report to council.

See all notes

5 Linnet Trust and Averil University freshwater survey, July 2026. Fry were found at Cooper’s Yard and at the Mercer Park inspection shaft.

See all notes

Are you sure?